top of page
Project (Instagram Post) (Instagram Story) (1)_edited.jpg

Florida Ave and 9th St from T St. to Barry

Industry

States

Partners

Lighting

Washington D.C.

McCain, GE, Delta/Arrow, Pelco Solutions, Orange Traffic Telegra Signs

Customers

Jaxson Point

The reconstruction of the Florida Ave and 9th St. NW project will improve the conditions of the current infrastructure including intersections with a safer/vision zero for all modes of transportation. This project is scheduled to be completed Summer 2022. Products provide Traffic Signals, LED's, T-Bases, Hardware, and LED Sign.

Traffic Systems & Technology

7390 Merritt Park Drive, Ste 160

Manassas, VA 20109

703.530.9655
 

  • Facebook
  • YouTube
  • Instagram
  • LinkedIn

© 2021 by Traffic Systems LLC.

Proudly created by  Center Stage Consulting,

bottom of page