top of page
Project (Instagram Post) (Instagram Story) (1)_edited.jpg

Florida Ave and 9th St from T St. to Barry

Industry

States

Partners

Lighting

Washington D.C.

McCain, GE, Delta/Arrow, Pelco, OrangeTraffic

Customers

Jaxson Point

The reconstruction of the Florida Ave and 9th St. NW project will improve the conditions of the current infrastructure including intersections with a safer/vision zero for all modes of transportation. This project is scheduled to be completed Summer 2022. Products provide Traffic Signals, LED's, T-Bases, Hardware, and LED Sign.

Traffic Systems & Technology

7390 Merritt Park Drive, Ste 160

Manassas, VA 20109

703.530.9655
 

  • Facebook
  • YouTube
  • Instagram
  • LinkedIn

© 2021 by Traffic Systems LLC.

Proudly created by  Center Stage Consulting,

bottom of page